Saturday, June 8, 2019

Fundamental Concepts of Construction for Project Management Case Study - 4

Fundamental Concepts of Construction for Project Management - Case Study ExampleI will serve as a handler from the clients side to supervise the managerial functions about the project. I will develop the bid documents and the estimator of our firm will fill the wag of quantities as a reference for the client to comp ar the subcontractors bids with. I shall be drawing a predecided fee from the client for this. Further, it is assumed that some of the previous drawings are lost, and some are preserved. I shall incorporate buildability concepts into the pre-existing design and do modifications in the building orientation and stuff to satisfy future needs and extend to future challenges. It is my responsibility to prepare the bid. I shall schedule it for the subcontractors. I shall offer all these services to the client to draw my fees. My firm will serve as a construction manager. Thus working as a construction manager, it is my duty to arrange specialty subcontractors. All of the wor k will be subcontracted. A few with material and equipment, and for heavy machinery, we shall have to either rent or lease the heavy machinery, whichever will be more economical. I shall shamble the unit cost with material contracts with the specialty contractors and choose the cheapest who has not front-loaded his schedule. I shall make the subcontractors purchase insurances for their own work, including workers insurance. Its my responsibility as a manager to visualise for site safety. The contractors will follow my schedule. So they will not fight among each other.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.